May. 14th, 2010

Panic

May. 14th, 2010 09:30 am
bertine: (condo fun)
Last night [livejournal.com profile] gwangi did the math and told me that he should be out of training no later than July of next year. This means I have about a year to get my condo in shape to sell and put it on the market.


It took about 16 hours until the feeling of panic set in. AAAAAAAHHHHHHHHHH!!!!!
This is what I want to get done before the end of summer. If I get this list done I have roughly half the square footage of my condo done and in good shape to sell.

My Bedroom:
Patch and paint the gouge in wall
Change Lights
Replace Fan over bed

Office:
Replace fan with light
Hang crown molding
Install baseboard
Patch walls
Paint desk leg
Install desk shelf
Drill desk hole
Paint

My Bathroom:
Paint light fixture
Install ceiling molding
Clean tiles
Paint door woodwork
Clean floor
Touch up vanity
Replace outlet
Fix Window Sill

Hallway:
Paint Linen Closet
Touch up paint

Catbox Room/"Den":
Replace light
Paint ceiling
Paint Walls

Storage Rooms:
New door knob installed
New hinges installed
Sort out Eric's Stuff

Eric's Bathroom:
Refinish Woodwork
Patch Walls
Replace Crown Molding
Paint

Strikeout: Done
Italicized: Added

April 2017

S M T W T F S
      1
2345678
9101112131415
16171819202122
232425 26272829
30      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 23rd, 2026 03:22 pm
Powered by Dreamwidth Studios