bertine ([personal profile] bertine) wrote2010-05-14 04:08 pm

Summer Projects

This is what I want to get done before the end of summer. If I get this list done I have roughly half the square footage of my condo done and in good shape to sell.

My Bedroom:
Patch and paint the gouge in wall
Change Lights
Replace Fan over bed

Office:
Replace fan with light
Hang crown molding
Install baseboard
Patch walls
Paint desk leg
Install desk shelf
Drill desk hole
Paint

My Bathroom:
Paint light fixture
Install ceiling molding
Clean tiles
Paint door woodwork
Clean floor
Touch up vanity
Replace outlet
Fix Window Sill

Hallway:
Paint Linen Closet
Touch up paint

Catbox Room/"Den":
Replace light
Paint ceiling
Paint Walls

Storage Rooms:
New door knob installed
New hinges installed
Sort out Eric's Stuff

Eric's Bathroom:
Refinish Woodwork
Patch Walls
Replace Crown Molding
Paint

Strikeout: Done
Italicized: Added

Post a comment in response:

This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting